EXMAR Offshore

EXMAR's FASTâ„¢ Riser Pull-in Procedure

EXMAR Riser Pull-in Procedure

EXMAR Offshore contacted our studio to demonstrate the process for their innovative riser pull-in procedure. The animated video was first shown during OTC in 2015, running at around six minutes in duration.


EXMAR Riser Pull-in Procedure

Through the use of 3D graphics, the production explains the design process of the Delta House and the procedure of EXMAR's FASTâ„¢ Riser Pull-in Procedure.


EXMAR Riser Pull-in Procedure

Our animation team worked with the engineers at EXMAR Offshore to better understand the technical details of the riser installation process and created a solution to showcase the procedure for thousands of oil and gas professionals at the conference.