EXMAR Offshore contacted our studio to demonstrate the process for their innovative riser pull-in procedure. The animated video was first shown during OTC in 2015, running at around six minutes in duration.
Through the use of 3D graphics, the production explains the design process of the Delta House and the procedure of EXMAR's FASTâ„¢ Riser Pull-in Procedure.
Our animation team worked with the engineers at EXMAR Offshore to better understand the technical details of the riser installation process and created a solution to showcase the procedure for thousands of oil and gas professionals at the conference.
Copyright © 2009 – 2024 | Bouncing Pixel, Inc. | All Rights Reserved
2802 Albany Street Houston, Texas 77006 tel: 281.822.8900